Details: laying and jointing pvc pipe. heading supply and construction work of 20 men living shelterscope of work provision of prefabricated modular or living shelter (20 men) of size 18.00 x 6.00 m clear ht 3.00 m at both sides and 3.55 m at the central gable with verandah 2.0 m wide on one side along the length of shelter, 02 nos puf doors, two nos aluminium door and 10 nos aluminium windows as per drawing and specification. design criteria. (a) seismic co-efficient :– as per seismic zone v (b) snow load :- 1 mtr standing on roof (c) wind load :- eqv. wo wind speed of 55 mtr/sec as per is 875 (d) roof :- 1:4 (e) external temperature :- (-) 40°c to (+) 35°c (f) water absorption/ :- nil (g) termite proofing :- termite proof (h) fire resistant :- fire retardant and should not emit toxic fumes (j) ease of construction :- shelter should be mudular in design (k) design load :- as per is-875 (l) ‘u’ value of external walls will not exceed 0.36 (+) 5% w/m²k.(technical specifi
Sector: Defense