Details: dismantling desert cooler of any make and capacity from its position after disconnecting electric connections, for carrying out repairs and renewal/ replacements of parts & motor, reassembling and installation of the same on same location and making electric connection required to make fully functional etc. complete all as specified and directed.(note :- parts renewed shall be measured and paid separately under appropriate items supply only of pvc front grill complete all as specified and directed. supply only of piano switch (5/6 amp) suitable for desert cooler complete all as specified and directed. supply only of pvc distribution box/ gang box suitable for piano switch (5/6 amp) suitable for desert cooler complete all as specified and directed. supply only of pvc elbow suitable for 15 mm dia pvc pipe of desert cooler complete all as specified and directed. supply only of pvc distributor suitable for 15 mm dia pvc pipe of desert cooler complete all as specified and directed.
Sector: Defense