Details: excavation in trenches n exc 1.5 m wide and nexc 1.5 m in depth for foundation of pole/stay and laying of ug cable/gi pipe and getting out in any type of soil complete all as specified and directed. m&l returning, filling and including spreading, levelling , watering and well ramming in layers not exceeding 25 cm complete all as specified and directed. removing excavated material nexc 50m and depositing where directed at a level nexc 1.5mtr above the starting point , complete all as specified and directed. surface excavation not exc 30cm deep and averaging 15cm deep and gettingout in any type of soil complete all as specified and directed. m&l reinforced cement concrete m-25 (design mix) using 20mm graded crushed stone aggregates as in foundations, including rafts, footings, foundation beams, plinth beams, bases of columns etc basement slabs, under-reamed piles and mass concrete complete all as specified and directed m&l reinforced cement concrete m-25 (design mix) using 20mm g
Sector: Defense