Details: excavation in trenches not exc 1.5m in width and 1.5 m in depth and getting out excavated soft/loose soil complete all as specified and as directed. returning filling in including spreading, levelling, watering and well ramming in layers not exc 25cm complete all as specified and as directed. removing excavated material / soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed. supply and lay fine sieved excavated dry soil cushioning spreading levelling for cable trenches complete all as specified and directed. (note: punned thickness only shall be measured and paid.) supply and laying well burnt bricks sub class 'b' in trenches for cable protection of u/g cable complete all as specified and directed. taking out the existing damaged/unserviceable lt under ground cable of size 10 sqmm x 2 core from trenches/ walls/poles/floors etc., removing the unserviceable fault cable
Sector: Defense