Details: b/r services/ works surface dressing not exc. 15 cm deep and getting out in soft/ loose soil including removing grass, roots, vegetations, etc. to a distance not exc. 100.00 metre and deposited, complete all as specified and as directed. excavating over areas, not exc. 1.50 metre in depth and getting out in soft/ loose soil, complete all as specified and as directed. removing excavated materials not exc. 50.00 metre and depositing where directed at a level not exc. 1.50 metre above the starting point, complete all as specified and as directed. preparing sub-grade by rolling and consolidating formation surfaces with power roller, exc. 8.00 tonne and not exc. 12.00 tonne capacity under optimum moisture content (omc) condition to obtain density at least 95% of modified proctor density at omc including fine dressing of sub-grade to required camber, gradient and slop with suitable (approved) earth, complete all as specified and as directed. note : earth required for filling will be measured
Sector: Defense