Details: surface dressing n.exc 15cm deep in soft /loose soil complete all as specified and as directed. excavating in trenches, not exc 1.5m wide and not exc 1.5m in depth; for foundation etc. or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sq. m on plan and not exc 1.5m in depth and getting out in soft/loose soil, complete all as specified. excavating in trenches, not exc 1.5m wide and exc 1.5m in but not exc 3.0m in depth; for foundation etc. or for shafts, wells, cesspits, manholes, pier holes etc. not exc 10 sq. m on plan and not exc 1.5m in depth and getting out in soft/loose soil, complete all as specified. returning, filling in floor, including spreading, levelling, watering and well ramming in layers not exc 25 cm in hard/dense soil, complete all as specified spreading levelling in layers not exc 25cm thick in floor including well ramming and watering complete all as specified and directed. m & l for removing excavated soils n exc. 50m and depositing where direc
Sector: Defense