Details: to perform term contract services and execute such works upon the items and condition contained or referred to in the aforesaid documents and upon the conditions here-in-after contained as may be demanded and as are enumerated in the aforesaid mes schedule of rates 2009 part-i (specifications) together with amendments nos 1 to 3 and ssr part-ii 2020 (rates) together with amendments nos 1 to 122 including section 30-runway and pavement and general conditions of contracts (iafw-2249) together with errata 1 to 20 and amendments no 1 to 49 forming part of tender documents at the rates contained in the aforesaid mes schedule during the period of one year from the date of acceptance of tender.note :- (i) the contractor may fill the %age intended to quote over ssr rates by selecting the option excess (+) or less (-) to quote the percentage above / below the ssr. (ii) if schedule rates are offered at par with mes schedule ‘0’ should be inserted in percentage box. (iii) the less/excess percenta
Sector: Defense