Details: soil investigation for provision of permanent armoury building at afstation jalahalli (a) mobilisation charges of all tools and plants along withaccessories, materials, labours, supervisors etc at site ofwork required in connection with boring and testing workincluding setting up boring and shifting it to different borehole points etc and also including withdrawal of the samefrom the site after.job 1 (b) drilling of boreholes of depth 15 m each at 25m c/cspacing at proposed site (3 no. x 3 no. grid).no ofbores2 note: if the depth of boreholes gets reduced due to siteconditions, deduction @ of rs 2000 per m of length ofborehole shall be made from the final payment.detailed specification and completed scope of soilinvestigation shall be as per annex –i enclosed herein
Sector: Defense