Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge. in all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. in all kinds of soil. brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1 cement : 4 coarse sand) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor v level in all shapes and si
Sector: Defense