Description: Construction of 24 degree gradient structure Hillock for CCPT vehicle testing in Test tack area at OFMK Name of Work Construction of 24 degree gradient structure Hillock for CCPT vehicle testing in Test tack area at OFMK
Details: Site clearence as specified and directed . Earth work in excavation of all kind of soils by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Complete all as specified and directed . PCC : Plain Cement Concrete (1:4:8) Type D-2 using 40 mm graded aggregate in foundations, floors, filling and mass concrete, Complete all as specified and directed . Stone Masonry : Walling of Squared Rubble regular coursed Stone masonry, well bonded, bedded and solidly hearted built in with 1:6 cement mortar, Complete in all respects as specified and directed. Brick work with sub class ‘B’ bricks straight or curved in plan exceeding 6m mean radius with 1:4 cement mortar. Complete all as specified and directed. RCC : Reinforced cement con
Sector: Defense