Details: arboriculture services at residential and technical area, tf at npol including t complex and thamasi building at npol, kochi(percentage oh & cp to quote on this amount only)note:a) see appendix-e for details of wages and other elements & cost of items included in the amount.b) the % (percentage) quoted is deemed to include the following:-i) contractor profit, over heads & service charges for complete scope of work including minimum wages, vda, epf & esi (employer share only) and bonus.ii) cost of all items/ tools (if any required over and above already included in the element by department in the estimate i.e appendix ‘e’).iii) cost of rubber hose pipes & minor repair etc., to the pumps and connected items etc., to supply water to the plants/assets from the source of supply.iv) cost of transportation of water/ arranging power supply tapping etc., from the nearest source in case of failure of existing system (till alternative arrangements are made by the department).v) cost of replaci
Sector: Defense