Details: phase 1 supply of mdp pcb, r105.19.1200-00, as per scope of work including nre charges, sow as per the annexure-1 , phase 2 supply of mdp pcb, r105.19.1200- 00 as per scope of work, pcb fabrication and pcb assembly, sow as per the annexure-1 , nre for phase 2 supply of mdp pcb, r105.19.1200-00 as per scope of work, item category/ sow as per the annexure-1 , phase 3 supply of mdp pcb, r105.19.1200-00 as per scope of work, pcb fabrication and pcb assembly, sow as per the annexure-1 , nre for phase 3 supply of mdp pcb, r105.19.1200-00 as per scope of work, sow as per the annexure-1 phase 1 supply of mdp pcb (r105.19.1200-00)as per scope of work , phase 2 supply of mdp pcb (r105.19.1200-00) as per scope of work , nre for phase 2 supply of mdp pcb
Sector: Defense