Details: plantation digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volumeof manure after reduction by 8%) flooding with water, dressing includingremoval of and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) :i) holes 0.90 m dia and 0.90 m deep supply and stacking of plant of ht. 180-210 cm bottom girth 25-30 cm well developed in big size hdpe bags as per direction of the engineer-in-charge shrub plantation (solo)digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volumeof manure after reduction by 8%) flooding with water, dressing including removal of and surplus earth, if any, with a
Sector: Defense