Details: part-i mobilization & demobilization 1.making necessary arrangement mobilization & demobilization for of equipment tools & plants, personnel, etc. required for soil investigation and their removal after satisfatory completion of work, in land including slushy areas. shifting of entire arrangemnt from one bore to another bore hole location and setting of boring/drilling rig as required (03 nos bore holes). part-ii field tests 2.boring 150 mm dia bore holes to any type of soil/rock to a depth of 75m or upto depth where n >50, whicever is earlier below the ground level by using rotary drill method in terms of is: 1892 (03) nos bore holes) (min depth of boring 75 m). 3.collection of undisturbed soil sample (uds) at 3.0m intervals or at any change of stratas in 100 mm bore thin walled tube including waxing, sealing, packing, and transporting to the lab (03) nos bore holes). 4.carrying out standard test (spt) including collection of disturbed soil samples in bore holes at every 1.50 m dept
Sector: Defense