Details: name of work : soil investigation for provn of deficient married accomdation (type-ii & type -iii) at new cgra near mandapam camp under icgs m&l for making necessary arrangement for mobilization anddemobilization of equipment, tools & plant, personnel etc required forsoil investigation and their removal after satisfactory completion ofwork in land including slushy areas1.00 job2 m&l for shifting of entire boring equipment and arrangement fromone bore hole to another bore hole location and setting of boring/drilling rig as required1.00 job3 m&l for boring 150mm dia bore holes in any type of soil/rocks to adepth of 15.0 mtrs at the locations as shown in the site plan below theground level by using rotary drill method in terms of is:1892( 20 boreholes) (min 1.0 mtr in rock , if rock is encountered d uring any of theboring,accordingly bore depth may go up , but not less than asmentioned for each type of bore) including collection of undisturbe dsoil samples at 3.0mtr interva
Sector: Defense