Details: rrt work for package -3 (vz 8,9 & 10) clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. excavation in hilly area in ordinary rock not requiring blasting by manual means including cutting and trimming of sand disposal of cut material with all lift and lead upto 50 metres. excavation work by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains exceeding 30cm depth, 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. providing and laying plum concrete in 1:2:4 c.c. (1cement, 2coarse sand, 4clean hard graded stone chips of 20 mm down nominal gauge) with 70% clean hard stone of sizes not exceeding 15c
Sector: Generation