Details: excavation in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m depth for foundation, trenches for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10sq m on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. excavating in trenches not exc. 1.5 metre wide and exc. 1.5 metre & not exc. 3 metre depth (beyond the first 1.5 metre) for foundation of poles etc and getting out in soft/loose soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm as in soft/loose soil complete all as specified and directed. removing excavated material not exc. 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. supply and laying cable xlpe insulated screened, pvc bedded, galvanised steel or wire armoured, electric power cables (heavy duty) 1100 volts grade with stranded al
Sector: Defense