Details: excavation in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m depth for foundation, trenches for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10sq m on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. excavating in trenches not exc. 1.5 metre wide and exc. 1.5 metre & not exc. 3 metre depth (beyond the first 1.5 metre) for foundation of poles etc and getting out in soft/loose soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm as in soft/loose soil complete all as specified and directed. removing excavated material not exc. 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. m & l for sand cushioning with clean dry sand in trenches for protection of under ground cables (below, above and around the cable laid in trenches) complete all as s