Details: repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c 412; l127 ships portable battery charger is nonoperational not generating rated output on di observed that transformer winding is burned out and nil output from r.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c 412; l113 during pme operation it was observed that pme dynamo was unable to provide charging voltage to the starting batteries view suspected dynamo malfunctioni.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c 412; e115 starting item category/ arrangement of emergency diesel driven pump 40tph not working and up rooted from the base due to material ageing overhauling of pump to be carr.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - icgs c 412; h11 base frame and securing stand of both main engine starting battery deteriorated due to material ageing base frame to
Sector: Defense