Details: dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within all lead of:-g.s. sheet, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the engineer in charge. (dismantled materials to be handed over to the deptt.) excavation work by mechanical means (hydraulic excavator)/ manual means in foundation trenches ordrains (not exceeding 1.5m (one point five meter) in width or 10 sqm (ten square meter) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, (one point five meter) including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m (fifty meter) ordinary rock, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the engineer in charge. providing and laying in position cement concrete of specified grade excluding the cost of centering andshutt
Sector: Transport Dept