Details: de-silting of check dams - 1,2,3,4,5,6,10 & 11aand check bunds - 1 to 6atbiom, bacheli complex, chhattisgarh mechanical exacavtion and removal of deposited silt/slime/fine ore in dry orwet condition in all lifts by mechanical means from check dams, check bundsand transporting by mechanical means including loading, unloading andlevelling the same, up to average lead distance and in all lifts, including makingnecessary haulage road, temporary arrangements for diversion of flow if any indams area for effective desilting and transporting etc. necessary watersprinkling for dust suppression along the haul road etc. complete as directed bythe engineer-in-charge. the measurement will be taken in volumetric methodat excavated site or at dump site based on the feasibility by carrying out jointsurvey in the presence of nmdc site-in-charge and contractor'srepresentative:desilting at cd-1 with lead 3.0 km.cu.m. 7000.00 quoted/ not quoted2mechanical exacavtion and removal of deposited
Sector: Mining