Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement – all work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand): 3graded stone aggregate 20 mm nominal size) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth lev
Sector: Generation