Details: excavation in trenches n.exc 1.5 m wide and n.exc 1.5 m in depth for foundation of pole and laying of ug cable and getting out in soft/loose of soil complete all as specified and directed. returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25cm complete all as specified and directed. removing excavated material to a distance n.exc 50m and depositing where directed at a level n.exc 1.5m above the starting point complete all as specified and directed. m&l for pcc 1:3:6 type c-2 (using 40 mm graded stone aggregate) as in foundation of pole and stay complete all as specified and directed. m&l for pcc 1:2:4 type b-1 (using 20 mm graded stone aggregate) for coping of pole and as in benching and finished exposed surfaced even and smooth without wiring extra cement including necessary form work complete all as specified and directed. supply, laying, testing & commissioning ug cable xlpe insulated,armoured heavy duty electric cable with al
Sector: Defense