Details: demolition brick or stone masonary built in cement mortar including all quoins arches pillars etc but excluding ashlars facing dressed stone work and precast concrete block, complete all as specified and as directed. dismantling asbestos cement (corugated or semicorrugated etc) sheets, in roof covering including ridge complete all as specified and as directed. dismantling timber scantling 40 sqcm and over in section in unframed work in any position complete all as specified and directed. taking down chowkhats or frames with shutters (without taking off shutter from the frame) of size n.exc 1.50 sqm each including making good disturbed portion of wall complete all as specified and directed. taking down chowkhats or frames with shutters (without taking off shutter from the frame) of size exc 1.5sqm but n.exc 4.0 sqm each including making good disturbed portion of wall complete all as specified and directed. demolition of reinforced cement concrete concrete (reinforcement cut as require
Sector: Defense