Details: installation, commissioning & alignment of different types of pump sets (electrical with starter and mechanical engine sets) including fitting of suction pipe, delivery pipe & valve etc. as required at main sumps of kaniha ocp dismantling & shifting of pumps with diesel engine/motor set including sluice valve, non-return valve and foot valve with suction pipe bend etc. from one place to another place. recovery of pontoon, shifting and installation of pontoon from one sump to another sump, from pump section to sump , sump to pump section as and when required. re adjustment of pontoon on decrease and incerease water level, opening and installation jetting hose, fiting of short piece pipe or opeining of short piece pipe making of 4” dia tee, reducer, bend including welding making of 6” dia tee, reducer, bend including welding making of 8” dia tee, reducer, bend including welding making of 4” short pipes by gas cutting and welding making of 6” short pipes by gas cutting and weldin
Sector: Mining