Details: without itc availability digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) holes 60 cm dia, and 60 cm deep providing and stacking of foxtail palm of height 8-10 ft and as per direction of the officer-in-charge. providing and stacking of arica palm of height 8-10 ft and as per direction of the officer-in-charge. providing and stacking of royal palm of height 8-10 ft and as per direction of the officer-in-charge. providing and stacking of rebonia palm of height 8-10 ft and as per direction of the officer-in-charge. supplying and stacking of well decayed cattle manure at site including royalty
Sector: Mining