Details: deployement of 3d hydraulic excavator/jcb as and where required for cleaning of drains and culverts etc. complete as per direction of the eic. (the cost of fuels, lubricants, all maintenance work and pay of operator etc will be paid by the contractor) deployement of adequate nos of manpower as and where required for cleaing of drains and culverts inside the mines premises etc. complete as per the direction of engineer in-charge. 04 nos daily at mines premises. carriage of materials/ earth by mechanical transport including loading. unloading and stacking (lead of skm). total impact of gst plus labour cess [@ 1 % (bocw cess to be deducted from the ra bill as per the value of the work progress)] for the purpose of ctc
Sector: Mining