Details: item description/ heading upkeeping of weighbridges by engageing two unskilled labour per day for each weighbridge including daily brooming and weekly mopping of floor in the control room, cleaning of glass panes/wooden panels of window/ door shutters, furniture, window grills etc of control room, cleaning of weighing platform, load cell, its support structure, approach to the platform, spillage coal from under the platform etc as per the direction of engineer-in-charge including the cost of all consumables like brooms, detergents, phenyle etc. (two labours to be deployed either in single shift or one labour each in two shifts as per convenience of the eic) (excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevant clauses of section - 300 of specif
Sector: Mining