Description: ADDITION AND ALETRATION TO DPB INTEGRATION HALL BLDG NO L 64 AT TBRL RAMGARH RANGE Name of Work ADDITION AND ALETRATION TO DPB INTEGRATION HALL BLDG NO L 64 AT TBRL RAMGARH RANGE
Details: Rough excavation not exceeding 1.5 m deep and getting out in soft / loose soil and removing excavated material n exc 50 m and depositing where directed at a level n exc 1.5 m above the starting point complete all as specified and directed. Demolition of cement concrete (unreinforced) of any description and in any position and removing excavated material n exc 50 m and depositing where directed at a level n exc 1.5 m above the starting point complete all as specified and directed Demolition of brickwork or stone/ boulder masonry built in cement mortar or cement lime mortar complete all as specified and directed. Demolition of reinforced cement concrete (unreinforced) of any description and in any position complete all as specified and directed. Dismantling structural steel work including doors, gates but excluding framed truss etc complete all as specified and directed. of broken stone or boulders of gauge exc 63mm but n exc. 100 mm, deposited, spread and levelled in layers n exc.
Sector: Defense