Details: disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 5km for all lifts, complete as per directions of engineer-in-charge. (ref: 1.1.18) reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement (ref: 5.2) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). (ref: 5.2.3) centering and shuttering including strutting, propping etc. and removal of form for : suspended floors, roofs, landings, balconies and access platform.(ref: 5.9.3) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. thermo-mec
Sector: University