Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. (dsr 2.8.1) providing & laying non pressure np-3 class medium duty rcc pipes of 300mm dia with collars /spigot jointed with stiff mixture of cement mortar in the proportion of1:2 (1 cement :2 find sand) including testing of joints etc. complete. (nsi) dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge :bituminous road (dsr 15.43.2) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cemen
Sector: Municipality