Details: disconnecting/taking down unsv following led street light/ flood light etc fittings from pole/structure/bldg. from any height and repair/checking and identifying of faulty spares, wirings, cleaning of fittings, cover, etc. and reassembling the same after repair, testing and refixing in original position and reconnecting with the electrical line complete all as directed by engr-in-charge. note: (i) materials required for replacement such as driver,wires, etc will be measured and paid separately under relevant items. (ii) creapers if any available on pole/structure to be removed without any extra claim. (iii) if e-n value on security fedder is high, it should be checked and rectified without any extra claim. supply an
Sector: Defense