Details: excavation in trenches not exceeding 1.50 mtr wide and not exceeding 1.50 mtr deep for taking out/ laying of under ground cable, pole, pipe, stay and getting out in any type of soil complete all as specified and directed. returning filling in including spreading leveling watering and well ramming in layers not exceeding 25cm spread thickness complete all as specified and directed. removing excavated materials to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.50 mtr above the starting point complete all as specified and directed. m&l for sand cushioning to under ground cable provided with a layer of sand 8 cm depth before laying of cable and 15 cm depth after laying and stretching the cable all as specified. note: punned thickness of sand shall be measured & paid. m&l for well burnt sub class 'b' bricks of nominal size 230x115x75 mm abutting each other for mechanical protection of cable with width equal to lenght of brick including taking out ol
Sector: Defense