Details: excavation in trenches not exceeding 1.50 mtr wide but for additional 1.50 mtr (1.50 to 3.00 mtr ) depth or part there of in depth beyond the first 1.50 mtr for taking out / laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments compleye all as specified and directed. excavation in trenches not exceeding 1.50 mtr wide and not exceeding 1.50 mtr deep for taking out/ laying of under ground cable, pole, pipe, stay and getting out in soft soil strata including making good to the disbturbed surfaces such as hardstanding, footpath/ pavments complete all as specified and directed. returning filling in including spreading leveling watering and well ramming in layers not exceeding 25cm spread any type of soil complete all as specified and directed. removing excavated materials not exceeding 50 mtr and depositing where directed at a level not exceeding 1.50 mtr above the starting
Sector: Defense