Details: loading & transportation of 6" dia gi/ms plpes from surface/ ug on trolley to site of installation,unloading & laying (length of pipe considered 6.0 mtr. each). joining of layed 16nos.6" dia gi/ms layed pipes (length of pipe considered 6.0 mtr. each). shifting of pump set (pump,base plate,pipes,valves, motor) and starter switches to be done at work site as per the instruction given by work incharge. on every two pillar length manually. loading of 1000 gpm pump with base plate at surface/ ug on trolley,transporting to site of installation & unloading loading of 150-200 kw motor at surface/ ug on trolley, transportation to site of installation & unloading. complete installation of pump including placing of bed plate, pump and motor alignment etc. unreeling,loading on trolleys, transportation of 250mtr. 50 sq.mm, 3core pvc armored power cable up to place of installation site, unloading and transporting to place of installation and fitting. providing & fixing m.s. nut bolt 5/8" x 2" in
Sector: Mining