Details: part a- general repair works dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) brick work with fly ash bricks in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) "brick work with fly ash bricks in super structure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand)cement mortar 1:6 (1 cement : 6 coarse sand)" half brick work with fly ash bricks in superstructure above plinth level up to floor v level in cement mortar 1:4 (1 cement :4 coarse sand). 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the pat
Sector: Mining