Description: Repairing of Coal receiving plate of mainframe hopper between unloading point to conveyor chain carriage plate of BWF Make feeder breaker installed at Tarmi siding in R O SDOCM Project Name of the Work Contract No
Details: Infrastructure making for repairing of coal receiving hopper. a) M.S channel (100x50) mm cutting work.16”x06 Nos b) M.S plate (3.16mm) cutting work for above.(40”+60”) x 02 side c) Welding work for above work(96”+80”+96”) Cutting of R.S joist (200x100) mm and M.S channel (100x50) mm changing of structure of above coal receiving hopper. a) Old & damaged structure member cutting work. 24”x08 Nos
Sector: Mining