Details: infrastructure making for repairing of coal receiving hopper. a) m.s channel (100x50) mm cutting work.16”x06 nos b) m.s plate (3.16mm) cutting work for above.(40”+60”) x 02 side c) welding work for above work(96”+80”+96”) cutting of r.s joist (200x100) mm and m.s channel (100x50) mm changing of structure of above coal receiving hopper. a) old & damaged structure member cutting work. 24”x08 nos
Sector: Mining