Details: a):-shifting of 100kva 11kv/440v transormer. of tubular pole of length exceeding 10m but not exceeding 12m in cement concrete 1:3:6 (1 cement 3 coarse 6 graded stone aggregate 40mm nominalize)foundation including excavation and refilling etc as required. erectionof acsr conductor of 7/3.35 mm to 7/4.00 diametre and above including binding etc as required 2span x 3 wire x 50 mtrs x 0.394 kg/m + 9 span x 4 wire x 40 mtrs x 0.214 kg/m = 426.36 kg suppying and of bow stay set complete (glavanised) with 19/20 mm dia x 1.8 meter long stay rod anchor plate of size 45cm x 45cm x 7.5 mm thimble stay clamps turn buckle (20mm x 60 cm ) 7/4 mm dia gi stay wire and strain insulator etc. in cement concrete 1:3:6 ( 1 cement 3 coarse sand 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling and also with 0.6 m long braceof size 50 mm x 50mm x6mm angle iron with 50 mm dia pulley fixed a1 one of the end of the brace as required. supplying of two lengths of channe