Details: cleaning the way and removal of sludge for recovery of the transformers and safety disposal within 50m as per instruction of engineer in charge. disconnection, re-organization, handling of ht /lt busbar and control cables of different sizes to a safe place to avoid any hindrance in the workplace as per instruction of engineer in-charge (both substaions) dismantling of auxiliary parts draining of oil, pulling shifting of transformer to a safe and assessable place for easy loading and transportation of transformer loading of 500 kva transformer on truck /mechanical means (crane/hydra/pulley system to be arranged by the agency) loading of two nos 100 kva transformer on truck /mechanical means (crane/hydra/pulley system to be arranged by the agency) unloading of transformer at the site as per instruction of engineer in charge on truck /mechanical means(crane/hydra/pulley system to be arranged by the agency) 500 kva un-loading of two nos 100 kva transformer on truck /mechanical means (crane
Sector: Mining