Description: Construction of view cutters at various locations/ stations.--Name of Work: Construction of view cutters at various locations/ stations.
Details: Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 SQM on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Providing and laying of hand packed stone boulder (size 150mm-230mm) before laying of mud mat compacted consolidated rammed filling the voids compacting all complete carriage upto site of work all head loads complete job.including all carriages. Providing/ laying position cement concrete of specified grade excl. cost of centering and shuttering all work upto plinth level 1:4:8 ( stone agg. 40mm nom. Size) incl. all carriages. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto p
Sector: Transport Dept