Description: PROVN OF AIR CREW TRANSIT ACCN AT AF STN THOISE UNDER GE AF THOISE Name of Work PROVN OF AIR CREW TRANSIT ACCN AT AF STN THOISE UNDER GE AF THOISE
Details: Excavation over area n.exc 1.5m deep and getting out in hard/dense soil complete all as specified and as directed. Excavating in trenches in hard/ dense soil n.exc 1.5M wide and n.exc 1.5M in depth for foundation, laying pipes, cables etc n.exc 10Sqm on plan and n.exc 1.5M in depth and getting out in hard/dense soil concrete complete all as specified and as directed. M&L for cement concrete type D2 1:4:8 (40mm graded stone aggregate) in foundation, filling and mass concrete/ foundation of manhole complete all as specified and as directed. M&L for cement concrete 1:3:6 type C-2 (using 40mm graded stone aggregate) 75 mm thick in plinth protection, laid in alternate bays not exc. 3.0m in length, finished surfaces even and smooth without using extra cement including demolition existing concrete and off the premises complete all as specified and as directed. M&L for PCC (1:2:4) Type B-1, Plain cement concrete with using 20mm graded aggregate in lintels upto 1.5 m clear span, copings,
Sector: Defense