Details: 1. mobilizaion of necessary equipments and man power to the project site & dismantling the same on completion of the field work from the site.2. two nos of bore holes of determination of sbc of soil by performing necessary test such as spt/ dcpt whichever is suitable, also recommended the type of soil at certain depth by performing borehole upto 6 mtr depth alongwith spt at 0.90 mtr in borehole or open pit 03 mtr depth in gravellery/ bouldery strata alongwith dcpt from est upto 6 mtr/ refusal whichever is earlier, collection of samples (distributed/ undistributed) their complete lab testing as per relevant is code-2720 taking sswl(if encountered) and otehr engineering and index properties and evaluation of soil bearing capacity. submission of test results and reports inm 4 (four)(copies) including recommendations regarding type of foundation. applying two coat of synthetic enamel paint on new steel surfaces of any description having width/girth exceeding 10 cm including preparation
Sector: Defense