Details: demolition of stone/brick masonary or boulder masonary built in cement mortar, complete all as specified and as directed. m&l for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in cement mortar (1:6), complete all as specified and as directed. all as per above item no. 2 above but except stone, complete all as specified and as directed. extra over stone walling for hammer dressing to face stones and dressing of face beds and joints, as specified, of random rubble walling, uncoursed or brought upto courses 20 mm, complete all as specified and as directed. m&l flush pointing in cement mortar (1:4) to random rubble masonry, uncoursed or brought upto courses all as specified and directed. m&l raised pointing to random rubble masonary or polygonal rubble masonary in cm (1:4), complete all as specified and as directed. m & l brickwork with sub class ‘b’ (old size) bricks, straight or curved on plan exceeding 6 metre mean radius built in cement sand m
Sector: Defense