Details: excavation in trenches n exc 1.5 m wide & n exc 1.5 mtr deep in depth for foundation, etc or for shafts, wells, cesspits, manholes, pier holesetc not exc 10 sqm on plan and n exc 1.5 mtr in depth and getting out of soft/lose soil for taking out pipe & laying of pipe & getting out for diverting of ci pipe line, complete all as specified and as directed. removal of excavated soil to a distance not exc 50 m and depositing where directed at a level not exc 1.5 mtr above the starting point, complete all as specified and as directed. returning, filling in, including spreading, leveling, watering & well ramming in layers n. exc 25 cm, complete all as specified and as directed. m&l for sand cushioning to under ground cables with a layer of sand 8 cm before laying the cable and 15 cm after laying the cable, complete all as specified and as directed. m&l for sub class "b" bricks laid dry width wise across the line of cable in treanchs as cable protection, complete all as specified and as direc
Sector: Defense