Details: excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in soft loose soil). excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 sq m on plan and not exceeding 1.5 m in depth and getting out (in mud). m/l providing plain cement concrete m 10 (1:5:10) for bedding using 40 mm size and down,graded aggregate mechanically mixed, for intercept drain pit and in foundation, compacted by vibration including centering and shuttering works, curing etc., complete as per drawings and technical specification and as per the direction of engineer. m/l pcc 1:2:4 for surface drains & channels all as sp. in mes ssr 2020. m/l providing and construction of reinforced cement concrete work of m-25
Sector: Defense