Details: excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre in depth for foundation, shafts, man holes, for under ground cable / of poles, stays, locating fault of lt cable and stay assembly etc not exceeding 10 square metre on plan and getting out in any type of soil including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and directed. all as per srl item no 1.00 here in before but depth exceeding 1.5 metre and not exceeding 3.0 metre. returning, filling in, in soil, including spreading, levelling, watering and well ramming in layers not exceeding 25cm thick each layer complete all as specified and directed. removing excavated material/soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as specified and directed. material & labour for sand cushioning to cable with a layer of sand 8 cm deep before laying the cable and
Sector: Defense