Details: sch 'a' section i (building works) is not pre-priced by mes and prepriced rates indicates 0.00 under column 6 signified this fact only. lump sum price worked out by the contractor for construction of md accn for airmen consisting of 04 qtrs in each block (double storey) at af stn faridabad with permanent specifications and as per drawing details note : schedule 'a' section -ii to x under are pre-priced by mes. lump sum price worked out by the contractor for demolition of building as listed in sch 'a' section-ii (refer prepriced shedule attached seperately) lump sum price worked out by the contractor for earth work as listed in sch 'a' section-iii (refer prepriced shedule attached seperately) lump sum price worked out by the contractor for as listed in sch 'a' path work as listed in sch 'a' section-iv (refer prepriced shedule attached seperately) lump sum price worked out by the contractor for sewage disposal as listed in sch 'a' section-v (refer prepriced shedule attached seperatel
Sector: Defense