Details: item description/ heading excavation in soil using hydraulic excavator and tippers with disposal upto 1000 metres. excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. wet mix macadam: providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to table no. 400-12, 400-13 and as per clause of section 406 of specifications. dry lean cement concrete sub- base: construction of dry lean
Sector: Mining