Details: part 1 (repairing of one no. starter 3.3 kv/6.6 kv (auto transformer starter) used for pumping at intermediate sump) repairing of isolator, painting of starter installation of the material if provided by the dept., complete testing of starter with auto transformer, complete wiring with ferrules and lugs, with control cable etc. as per instruction of eic(power cable provided by the dept.). providing of earth leakage relay with cbct 2.5 amp 110v(or as per technical specification given by the eic) part 2 (rewinding/repairing of auto transformer 595 kw, 6.6 kv used for auto transformer starter) super enameled copper wire for replacing burnt existing coils insulating materials like press pan paper cotton tape etc. coil preparation and winding charges labour charges and reinsulating of coils less scrap/burnt copper coil total impact of gst for the purpose of ctc
Sector: Mining