Details: excavation/cutting in floor/side/roof and dressing using pick axes by manual labour. hard stone. mixed coal & shale. cleaning of malma, muck slurry in gallery. rcc work in u/g including centering & shuttering etc rainforce cement for rcc work including, cutting, bending placing in position and binding etc all complete. (1:2:4). 12 mm thick cement plaster (both side). trasnportation of material loading of all kinds of building material in to mine tub at incline mouth. unloading of all kinds of building material at destination in ug. pushing of tubs for 984 ft/110 ft= 8.95 lead=says=09 lead, so rate for 09 leads = 5.99x 9 lead= rs. 53.91 rs. rs. 5.99/tub or 1.15 , so nos. of tubs 180.15 = 180.15/1.15 = 156.65 tubs, says= 157 tubs. lead for transportation of material by manual labour with 201 ft to 250 ft leads (surface & ug). rs. 119.64/tub or 1.15 , so no of tubs for 180.15 =180.15/1.15=156.65 tubs, says = 157 tubs. material cost cement sand (river sand) stone chips (20
Sector: Mining